Our Remodeling Inside – Phase One
Beginning Date: Winter 1998
Ending Date:
Winter 1999
Projects:

Replaced counters and laminate flooring in kitchen area
Replaced carpeting in house
Connected work shop room to main house
Added hallway and bathroom and walk-in closet to new attached room
Repainted inside of house


Our Remodeling Outside - Phase One
Beginning Date: Winter 1999
Ending Date: Summer 2001
Projects:
Redoing yards (new soil - new sod - new sprinkler systems)
Redoing landscaping
Upgrading plumbing leading to house
Redoing concrete on sides of house
Expanding driveway
Redoing front of house in brickwork (new patio - new walkways - new planters)
Repainting house in Texture Coating


Our Remodeling Inside – Phase Two

Beginning Date: Summer 2003
Ending Date: Summer 2006
Projects:
Redoing plumbing and electrical for the house
Adding air conditioning (two units) to the home
Redoing master and middle bathroom
Redoing kitchen and laundry room (includes moving some walls and doors and windows)
Adding new carpet in bedrooms and wood flooring in main areas
Upgrading lighting in main areas (from ceiling fixtures to recessed lighting)
Replacing remaining metal windows with new vinyl windows
Converting existing TV room into new master bedroom

Converting existing master bedroom into bedroom for our daughter
Converting garage into exercise room and business work space
Adding new TV room onto house
Adding front porch onto house
Redoing back patio
Repainting inside and outside of house
Replacing roofing


Our Remodeling Outside - Phase Two
Beginning Date: Spring 2007
Ending Date: Fall 2007
Projects:
Replacing insulation in the main attic
Adding extra insulation in the outside bedroom walls
Repainting trim and stucco on house and outside structures
Installing gate across backyard to seperate levels
Installing wood fencing in playarea
Adding brickwork on new back patio
Repairing lawn area and sprinklers in backyard
Planting hedge trees





Inside are pictures from our various phases of remodel..please come take a peek