August intake 1997


MSc in Integrated Construction Project Management AP 76 Part time Students, ITM Shah Alam

This page is hosted by AMADIS

(Greetings from Amadis:-)one of my selected music




Awarded with MSc. Degree from University of Technology Mara, UiTM (formerly ITM) on 13th November 1999 and Best Student for overall Masters Degree 1999 and Best Student for the Faculty of Architecture, Planning and Surveying



Completed the Master's course in 5 semesters out of 6 (as part-time)- from Aug. 1997 to May 1999



Abstract from the local newspaper- Mingguan Malaysia on 14 Nov. 1999, pg. 15




Master's Assignments Abstracts



Previous Semester 01 Topics-August '97 to November '97


Integrated Simulation Project Part1 ISP618

Course work:-



ISP Part1

Design Process and Contract Management DCM613

Assignment one:-


-Brief historical context for Design process management (DPM)

-Case study based on factual investigation of an existing DPM for a major construction project

Assignment Two:-


-Whole Total Project Management Process-Conceptualisation & Theoretical model

-Using a schematic to outline the whole project, the various stages from feasibility study to closing of final accounts


Previous Semester 02 Topics- december to march 1998


Integrated Information Technology-Construction Industry 1 ITC614

Assignment one:-

-Information system in contractor's office


Assignment two:-

-Office LAN setup


Risk Management RFM616

Case Study on construction risk:-

-The Case Study on massive rock removal during the construction stage

Assignment one:-

-Explain HAZID in relation to the case study

Assignment two:-

-Probability technique in risk management in relation to case study

Assignment three:-

-As risk manager, the issues, comments and recommendations to improve the risk management system-report to ceo on guidelines

Previous Semester 03 Topics-April '98 to August '98


Integrated Simulation Project Part2 ISP619

Course work:-(best award*)



ISP Part2-Turnkey Submission

Contractor's rep.

Powerpoint presentation on ISP Part II


Click here-ISP II


Evaluation of Construction in the International Market ECM 611

Course Work one:-


-An abstract on Foreign Direct Investment in Constrn. Industry in Cambodia

-Sample in Table of Contents

-Document

Presentation in Powerpoint on FDI Cambodia

LOGIN
PASSWORD


Assignment Two:-(Prof. VB Torrance paper)


-An absract of the study on a Malaysian Investor/company in Cambodia (Abstract of the assignment)

-Document in (PDF)

Powerpoint presentation on Investor-Cambodia


Click here


-Typical questionaire sent to collect soft information



Semester 04 August 98 to November 98

All PDF files need Acrobat Reader3 to view documents


Corporate Strategy Management & Organisational Behaviour in Constrn. Ind.-CSB 652

Corporate Strategy Management:Case Analysis Assignment on Kwik-Fit:Part 1 to Part 4



Part 1:Kwik-Fit is Tom Farmer

-Farmer's strategic plans (PDF file)

Part 2:Investment in Kwik-Fit is merely in Tom Farmer

-Farmer's uses shareholders investment in formulating company strategies (PDF file)

Part 3:Kwik-Fit's success due to luck ?...

-Farmer's business acuteness not luck! (PDF file)

Part 4:Kwik-Fit's strategic competitive position to meet future challenges

-Critically assess by mapping Kwik-Fit position in the market using Feurer and Chaharbaghi framework (PDF file)

Powerpoint presentation on Kwik-Fit Assignment


Click here-Kwik


Organisational Behaviour:Three assignments



Assignment one:Leadership affects motivation and work performances of Employees

Current leadership using the power of motivation bringing the best work performances (PDF)

Assignment two:Three major OB problems as a result of recent economic scenario in the country

Three major OB problems discussed and suggestive measures (PDF)

Assignment three:OB in a construction organisation

Strategies in one Organisation structure described (PDF)


Human Resource Management - HRM 655

Dynamic construction company


Integrated IT for the Construction Industry -IIC 664:Three assignments

1. Information Strategic System Planning for Hospital (PDF)

2. System Analysis-EMR (Electronic medical record) for hospital (PDF)

3. Kappa-PC Expert tool coursework (PDF)






My Final Semester 05 January 1999 to May 1999


Required Acrobat3 to Open Document


Final MSc. Dissertation


Dissertation Abstract Dis709

Management of Property and the Environment - MPE657


Part 1 Facility Management

Part 2 Environment Management

Part 3 Maintenance Management (request author to email)





Dissertation Topics : My Dilemma


The following are few topics of interest to me and ideas compiled for my dissertation assignment---Please visit


+Inspiring guidelines
+Dissertation types
+Type of Table of Contents

Request more info-plse
Get help


Lastest modified:23/1/2009 from 4/4/2005 and reactivate on 9/5/2004

Regards Ahmad Ismail