Curriculum Vitae |
![]() |
![]() |
H a l d a H j M o h a m m e d |
Date of Birth: September 1975 |
Current Address: D - 1 - 3 Kesuma Apartments, Bandar Kinrara BK3, 47100 Puchong, |
Selangor, MALAYSIA |
E-mail: master_halda@yahoo.com |
h/p: 6 (012) 385 7250 |
E d u c a t i o n |
U n i v e r s i t i T e k n o l o g i M a l a y s i a |
Gas Distribution for Engineers |
Jan 2003 - June 2003 |
B. Sc. Industrial Engineering |
Aug 1996 - Dec 1998 |
I n d u s t r i a l E x p e r i e n c e |
Oilfield Pipeline Inspection - Pipeline Services |
- P r o j e c t / F i e l d E n g i n e e r |
Planning, scheduling and execution of job both in the office and on field. |
Preparation of procedures, data gathering and final report completion of projects involved. |
Projects Involved Includes:- |
Precommissioning of 32" x 66km pipeline from B11DR-A to E11R-B |
Dewatering, Swabbing, Vacuum Drying, Nitrogen Purging & Commissioning |
Rejuvenation of 10" x 12.7km pipeline from West Lutong P-A to Miri Crude Oil Terminal |
Cleaning, Hard De-Scaling, Gauging, Caliper Survey & MFL Inspection |
Applied Industrial Engineering - Pipeline / Piping Construction |
( A p r i l 2 0 0 3 - P r e s e n t ) |
( N o v e m b e r 0 1 - A p r i l 0 3 ) |
- P r o j e c t E n g i n e e r |
Responsible for the coordination of both on and offsite for the pipe laying activity |
Preparation of procedures, authority submission (permit acquisition) and report writing for projects involved. |
Projects involved includes the followings: |
EPCC of NGDS for the Malaysia Design Technology Center - Cyberjaya. |
180mm MDPE & Various sizes of complete internal Carbon Steel reticulation piping |
EPCC of NGDS for the Precinct 16 - Putrajaya |
NPS 16 x 5 km / 180mm MDPE pipeline |
EPCC of NGDS for the Parcel E, Precinct 1 - Putrajaya |
180mm MDPE reticulation pipeline |
EPCC of NG Metering Station for SKS Power Plant - Prai |
Fabrication, Installation, Hydrotest of Carbon Steel pipeworks |
EPCC of NGDS for E2/E3 Government Building Parcel E, Precinct 1 - Putrajaya |
Fabrication, Installation of Carbon Steel reticulation piping |
EPCC of LPG reticulation system for Ampang Hospital |
Installation of 20KL bulk tank system, piping works and hyrdotest of the system. |
EPCC of 18" x 13km Tanjung Langsat Lateral Natural Gas Pipeline |
Involvement includes the precommissioning & hot tap work of pipeline |
Sobena Offshore Inc - Tubular Goods Threading |
( A p r i l 2 0 0 1 - O c t o b e r 2 0 0 1 ) |
- P l a n t E n g i n e e r |
![]() |
Responsible for the plant machineries optimization for maximum threading production |
Oversee and implement the whole plant HSE Management System |
Hands on experience on CAD/CAM software for turning and milling machineries application |
Professional Loss Control - Safety & Risk Engineering Consultancy |
( O c t o b e r 1 9 9 9 - M a r c h 2 0 0 1 ) |
- P r o j e c t / R i s k E n g i n e e r |
Responsible to assist the Principal Consultant on project during site visit and technical discussion with clients. |
To develop the qualitative risk assessment using TRACE 8.0 software with given mitigation measures as part of the Controls of Industrial Major Accident Hazards (CIMAH) |
Among the projects involved includes the followings: |
Preparation of CIMAH for the Kaneka Petrochemical Complex - Gebeng. |
![]() |
Preparation of CIMAH for the Perbadanan Air Melaka Chlorine Facilities - Air Keroh |
Preparation of CIMAH for the Petronas Centralized Utilities Facility - Kertih |
Preparation of Emergency Response Procedures for Perbadanan Air Melaka Chlorine Facility |