...as it's happening... (adventure 5a) |
![]() |
Day 3 found us ready with a plan... -underlayment layed & trimmed -3/4 in. styrofoam cut & set -call together a crew to handle the liner |
...took six of us to get the liner in place & folded. This pic shows "first water" ...within seconds , six of us are tugging out wrinkles & checking folds... |
Our first evening reflections, at the end of day 3. |
Day 4 -set & level the biofalls box Here we are cutting these solid 4 inch thick blocks to get them to fit just right for a five step water fall. |
...then got started laying the top course with these heavy tumblewall blocks. |
After about 2 weeks from starting... installed charcoal colored pavers around the perimeter with a feeding area at the end also. The pvc piping is done & pumps are running. (even got the yard cleaned up a bit) ;) |
back to - start of construction |
ya gotta see what's next |
check out our "Our Koi Adventure" pages |
![]() |
![]() |
![]() |
![]() |