...as it's happening...
(adventure 5a)
building an underground home
first water ,  awesome !
another day winding down
Wayne & Dan cutting blocks
taking a nap again, pretending to read the level
so far so good... , but not quite yet...
send Wayne & Becky an e-mail here
Day 3 found us ready  with a plan...
-underlayment layed & trimmed
-3/4 in. styrofoam cut & set
-call together a crew to handle
the liner
...took six of us to get the liner
in place & folded.
This pic shows "first water"
...within seconds , six of us are tugging out wrinkles & checking folds...
Our first evening reflections,
at the end of day 3.
Day 4
-set & level the biofalls box
Here we are cutting these solid
4 inch thick blocks to get them
to fit just right for a
five step water fall.
...then got started laying the
top course with these
heavy tumblewall blocks.
After about 2 weeks from starting...
installed charcoal colored pavers
around the perimeter with a feeding
area at the end also.
The pvc piping is done & pumps
are running.  (even got the yard cleaned up a bit)   ;)